12/22/2023 0 Comments Slavania campus mechac shop![]() Additional trees will extend the campus tree canopy, which can help cool temperatures in parking areas. Campus sustainability will be improved with increased landscaping and stormwater retention. The renovation also includes site improvements to enhance campus safety, accessibility, transit, and connectivity. The plans show evidence of the HT project goals of increasing wayfinding, accessibility, and inclusivity while also adding to the college’s sustainability goals. During the schematic design phase, numerous test fits have aimed to maximize the efficiency of each program’s area within the existing floor plate and structure. During predesign, the design team worked extensively with the college to catalog all of their needs, wants, and must-haves for incorporation into the design. With the help of users and the campus community, the project concluded the design phase. This project has been characterized by its heavy approach to stakeholder engagement. This plan also includes adding some temporary structures onto campus during construction to alleviate some of the needed swing space. Through diligent coordination and planning, the majority of these smaller renovations will be permanent improvements to the Sylvania campus even after the main HT renovation is complete. In addition to the large renovation for the HT building, P&CC has identified about 20 smaller renovation projects on the campus to accommodate all the departments being displaced during construction. Some programs will move temporarily and some permanently in order to provide a better educational synergy for students. While construction takes place, the existing programs on the east side of the building will need to be relocated. The project includes the build-out of several departments including Architecture, Interior Design, Nursing, Medical Imaging and Radiography, Physical Education, Exercise Science, and a series of support and collaboration spaces throughout. While the massive building is divided into three main sectors (east, west, and diving and lap pool), this renovation will focus on the east side of the building with plans to upgrade the remaining areas in the future. Built in the late 1960s, the HT currently houses STEAM and health professions classrooms. The renovation of Sylvania’s Health Technology (HT) building is the largest project in the 2017 bond.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |